Southern California Wetlands Recovery Project

Description The Southern California Wetlands Recovery Project is dedicated to acquiring, restoring, and expanding coastal wetlands and watersheds throughout Southern California. The Wetlands Recovery Project, an alliance of federal, state and local officials working in concert with business and nonprofit organizations, is coordinating activities and targeting resources, turning piecemeal efforts into a visionary and long-term regional approach. For more information, visit https://scwrp.org.
Organization State Coastal Conservancy Number of Projects 114
Mapped Projects https://ecoatlas.org/regions/group/95

Habitat Projects


Habitat Project Name Status County Total Acres
Agua Hedionda Caulerpa Taxifolia Eradication Program
Map
Completed San Diego 364.0
Alamitos Bay Oyster Restoration Project
Map
Completed Los Angeles < 0.1
Aliso Creek Estuary Restoration Plan
Map
Planning Orange 6.00
Arroyo Burro Estuary and Mesa Creek Restoration
Dataset Monitoring Report Photo Plan or Permit Map
Completed Santa Barbara 0.64
Arroyo Hondo Creek Steelhead Passage Enhancement
Map
Completed Santa Barbara < 0.1
Arroyo Hondo Ranch Acquisition
Map
Completed Santa Barbara 800.0
Atascadero and Maria Ygnacio Steelhead Restoration Design
Map
Planning Santa Barbara 1.62
Ballona Wetlands Acquisition
Map
Completed Los Angeles 560.0
Ballona Wetlands Restoration Planning
Map
Planning Los Angeles 600.0
Batiquitos Lagoon Mitsuuchi Acquisition
Map
Completed San Diego 18.11
Big Canyon Creek Restoration and Estuary Adaptation Project
Map
Planning Orange 18.70
Big Canyon Creek Restoration Plan
Map
Completed Orange 45.00
Bitter Point Salt Marsh Acquisition
Map
Planning Orange 3.00
Bolsa Chica Lowlands Sea Level Rise Adaptation Project
Planning Orange 840.0
Bolsa Chica Wetlands Restoration
Monitoring Report Map
Completed Orange 566.0
Brookhurst Marsh Acquisition
Map
Completed Orange 16.60
Buena Vista Audubon Society Wetlands Reserve Restoration Project: 60% Design and Engineering
Planning San Diego 3.50
Buena Vista Creek Acquisition - Sherman Property
Map
Completed San Diego 133.8
Buena Vista Creek Watershed Plan
Map
Completed San Diego < 0.1
Buena Vista Lagoon Enhancement Project: 65% Design and Engineering Plans
Map
Planning San Diego 282.9
Buena Vista Lagoon Restoration Plan, Feasibility Analysis
Completed San Diego 133.8
Carlsbad Hydrologic Unit Riparian Habitat Restoration
Map
Completed San Diego < 0.1
Carpinteria Creek Arundo Removal Project
Map
Completed Santa Barbara 2.50
Carpinteria Salt Marsh, Basin 1 Enhancement Plan
Map
Completed Santa Barbara 33.00
Carpinteria Salt Marsh, Basin 1 Implementation
Monitoring Report Map
Completed Santa Barbara 29.00
Coal Oil Point Reserve Coastal Access and Habitat Restoration
Map
In-progress Santa Barbara 217.0
Cold Creek Enhancement Plan and Acquisition
Map
Completed Los Angeles 71.50
Colorado Lagoon Restoration
Map
Completed Los Angeles 15.00
Cottonwood Creek Park Riparian Restoration
Map
Completed San Diego 2.40
Coyote Creek Watershed Plan
Completed Orange < 0.1
DeForest-Dominguez Gap Wetlands: Planning and Design
Map
Completed Los Angeles < 0.1
DeForest Wetlands Restoration
Map
Completed Los Angeles < 0.1
Devereux Slough/Ellwood Mesa Regional Plan
Map
Completed Santa Barbara < 0.1
Devereux Slough: Ocean Meadows Acquisition
Map
Completed Santa Barbara 63.00
East Garden Grove Wintersburg Channel Treatment
Map
Completed Orange < 0.1
El Dorado Wetlands Restoration Plan
Completed El Dorado 20.00
Escondido Creek Watershed Restoration Action Strategy
Completed San Diego < 0.1
Famosa Slough Culvert Extension and Retrofit Design
Map
Completed San Diego < 0.1
Fenton Properties Acquisition
Completed San Diego 100.0
Goat Canyon Enhancement Project
Completed San Diego < 0.1
Goleta Slough Tidal Restoration
Map
Completed Santa Barbara 2.00
Hanson Floodplain Restoration
Map
In-progress Ventura 238.0
Hanson Pond Acquisition, El Monte Valley
Map
Completed San Diego 143.5
Hazard Park Wetlands Restoration Concept Plan
Map
Completed Los Angeles 5.00
Hedrick Ranch Nature Area Restoration Project
Map
Completed Ventura 223.0
Huntington Beach Wetlands Restoration
Map
Completed Orange 253.6
Las Flores Creek Restoration
Map
Completed Los Angeles 215.2
Loma Alta Slough Wetlands Enhancement Project - Phase 2 Implementation
Map
Planning San Diego 6.80
Los Angeles River Taylor Yard: Acquisition & Implementation Plan
Map
Planning Los Angeles 42.60
Los Cerritos Wetlands Complex - Bryant Acquisition Phase 1 & 2
Map
Planning Los Angeles 378.0
Los Cerritos Wetlands Southern Area Planning and Permitting
Planning Los Angeles 105.0
Los Penasquitos Creek Sediment Management
Map
Completed San Diego 3.00
Los Penasquitos Lagoon Restoration Design and Feasibility Study
Map
Planning San Diego 23.00
Lower Refugio Creek Restoration
Map
Completed Santa Barbara 4.00
Machado Lake Habitat Restoration Project
Map
Completed Los Angeles 104.0
Malibu Creek Arundo Removal Project
Map
Completed Los Angeles 100.0
Malibu Creek Steelhead Barrier Removal (Cross Creek Road)
Map
Completed Los Angeles 1.00
Malibu Lagoon Restoration
Map
Completed Los Angeles 31.00
Matilija Dam Ecosystem Restoration Program
Map
Planning Ventura 9.22
Matilija Dam Removal Feasibility Study
Map
Completed Ventura < 0.1
McGrath State Beach – Wetlands Restoration and Campground Relocation
Planning Ventura 30.00
Mission Creek Fish Passage Enhancement Project
Map
Completed Santa Barbara 1.26
Mission Creek Museum Area Restoration Plan
Map
Completed Santa Barbara 1.50
Newland Marsh Acquisition
Map
Completed Orange 44.00
Newland Marsh Restoration Permitting and Design
Planning Orange 44.80
Ormond Beach Edison Acquisition
Map
Completed Ventura 260.0
Ormond Beach Wetlands: Acquisition, Part 2
Map
Planning Ventura 561.0
Ormond Beach Wetlands Restoration Plan
Map
Planning Ventura 1,100
Prisoners Wetland and Lower Canada del Puerto Restoration
Map
Completed Santa Barbara 400.0
Randall Preserve Wetland Feasibility Study
Planning Orange 385.5
Redondo Beach: Power Plant to Park Acquisition and Planning
Map
Planning Los Angeles 30.29
Re-Wild Mission Bay Conceptual Plan
Completed San Diego 170.0
Rio Hondo/Upper San Gabriel River Watershed Arundo Eradication Program
Map
In-progress Los Angeles 45.00
San Diego Bay Native Oyster Living Shoreline
Map
Proposed San Diego < 0.1
San Diego Canyon Wetlands Restoration Project
Map
Planning San Diego 1,717
San Diego County Marine Protected Area (MPA) Wetland Restoration Project
Map
In-progress San Diego 41.90
San Diego River Land Conservation Program: Hanlon-Walker
Map
Completed San Diego 105.0
San Dieguito Lagoon Wetland Acquisition
Map
Completed San Diego 75.00
San Dieguito Watershed Invasive Species Control and Re-vegetation
Map
In-progress San Diego 847.0
San Elijo Lagoon Restoration
Map
Completed San Diego 960.0
San Joaquin Marsh Enhancement - Phase I
Map
Completed Orange 50.00
San Joaquin Marsh Hydrology & Climate Adaptation Feasibility and Planning
Map
Planning Orange 100.0
San Jose Creek Fish Passage Improvements - Dos Arroyos Ranch
Map
Completed Santa Barbara < 0.1
San Jose Fish Passage Project
Map
In-progress Santa Barbara 1.03
San Juan Hydrologic Unit - Non-native Species Eradication Plan
Map
Completed Orange < 0.1
San Luis Rey River Arundo Removal and Habitat Restoration
Map
Completed San Diego 35.52
Santa Barbara Urban Streams and Wetlands Restoration
Completed Santa Barbara < 0.1
Santa Clara River Riparian Restoration and Community Engagement for the Santa Paula-to-Sespe Conservation Area
Map
In-progress Ventura 6,000
Santa Margarita River Fish Passage Project
Map
Completed San Diego 15.00
Santa Monica Bay Watershed Acquisition
Map
Completed Los Angeles 849.0
Seal Beach Sediment Augmentation Project
Map
In-progress Orange 10.00
Serrano Creek Stabilization and Restoration
Map
Completed Orange < 0.1
Solstice Canyon Acquisition
Completed Los Angeles 556.0
Solstice Creek Steelhead Access Implementation
Map
Completed Los Angeles < 0.1
South San Diego Bay Coastal Wetland Restoration Project
Map
Completed San Diego 257.0
Summerland Greenwell Preserve Enhancement
Map
Completed Santa Barbara 2.00
Tijuana Estuary Tidal Restoration Program: I & 2
Map
Planning San Diego 2,180
Tijuana River Valley Invasive Plant Control Plan
Completed San Diego < 0.1
Topanga Creek and Lagoon Restoration Program
Completed Los Angeles 30.00
Topanga Lagoon and Watershed Restoration
Completed Los Angeles < 0.1
Topanga Lagoon Restoration Planning Phase 1
Map
Planning Los Angeles 41.00
Trabuco Creek Fish Passage Project at the Metrolink and I-5 Bridges
Map
Planning Orange 25.00
Trancas Creek Flood Control Channel Restoration Planning Project
Map
Planning Los Angeles 5.50
Trancas Creek Lagoon Restoration Planning Project
Map
Planning Los Angeles 7.00
Tuna Canyon SEA Acquisition
Map
Completed Los Angeles 417.0
Upper Devereux Slough Restoration Implementation
Map
In-progress Santa Barbara 136.0
Upper Los Angeles River Watershed Arundo Eradication Program
Map
In-progress Los Angeles 80.00
Upper Newport Bay and Alamitos Bay Living Shoreline Project
Map
In-progress Los Angeles, Orange < 0.1
Upper Newport Bay Ecological Restoration Implementation
Map
Completed Orange 1,000
Upper Sulpher Creek Restoration
Map
Completed Orange 5.10
Upper Zuniga Road Acquisition
Map
Completed Los Angeles 120.0
Ventura River Arundo Removal Project
Map
Completed Ventura 5.17
Western Goleta Slough Wetland Restoration
Map
Completed Santa Barbara 34.41
Zuma Canyon Restoration and Steelhead Enhancement
Map
Completed Los Angeles 6.00