La Jolla Centre III

Status Planning County San Diego
Project Type Compensatory mitigation Location 32.87550° N, -117.20647° W Map
Project Area (Acres) 1.17 Last Updated 12 April 2023
Project Abstract The proposed project La Jolla Centre III Project consists of the construction and operation of a new 15 story, aboveground, approximate 340,000-square-foot office building within the La Jolla Centre office complex. The proposed project also includes const; Mitigation Type: Mitigation Bank.
Administrative Region San Diego Regional Water Quality Control Board - Chad Loften, Eric Becker, SDRWQCB

Project Identification

IDType
No Data

Habitat Plan

Site NamePhaseActivitySubActivitiesHabitatSubHabitatAcresActivity StatusWater Regime
Rancho Jamul Mitigation Bank None Creation/Establishment Unspecified Unknown/unspecified wetland habitat None 0.74 Construction planned
Rancho Jamul Mitigation Bank None Restoration (unspecified) Unspecified Unknown/unspecified wetland habitat None 0.37 Construction planned
Rancho Jamul Mitigation Bank None Unknown/Unspecified Unspecified Unknown/unspecified wetland habitat None < 0.1 Construction planned

Related Habitat Impacts

Impact Project NameHabitatAcres LostType of Loss
La Jolla Centre III-impact Unknown/unspecified wetland habitat < 0.1 Lost Permanent

Sites

NameStatusAcres
Rancho Jamul Mitigation Bank Construction planned 1.17

Events

DateTypeDescriptionSite Name
2018-01-02 Groundwork end Estimated date
2013-07-29 Project entered Project entered into database
2013-01-02 Groundwork start Estimated date

People

TypeNameOrganizationDepartment
No Data

Funding

PhaseActivityFunderAmount
No Data

Related CRAM Assessments

Visit DateVersionSite NameWetland TypeIndex Score
No Data
Name File Type Submitted On Submitted By
401 Certification for La Jolla Centre III Project Plan Or Permit 2014-03-10 SFEI, SFEI
La Jolla Centre III Project Map Other 2014-03-10 SFEI, SFEI
Local Vicinity Aerial Other 2014-03-10 SFEI, SFEI
Map for 12C-042 project Photo 2014-03-11 Alexander Tasoff, SFEI/State Waterboard
Proposed Riparian Enhancement and Mitigation Sites Other 2014-03-10 SFEI, SFEI
Proposed Riparian Mitigation Map Other 2014-03-10 SFEI, SFEI

How to Use the Habitat Development Curve

Habitat Development Curves (HDCs) are used to determine the developmental status and trajectory of on-the-ground projects to create, restore, or enhance California wetland and stream habitats. Each HDC is based on assessments of habitat condition for different age areas of one habitat type that in aggregate represent the full spectrum of habitat development. The assessments of condition are provided by expert applications of the California Rapid Assessment Method (CRAM). Visit the CRAM website for more information about CRAM.

For each HDC, reference condition is represented by areas of a habitat that consistently get very high CRAM scores, have not been subject to disruptive management practices, and exist within landscapes that are protected and managed for their natural conditions. The horizontal lines intersecting the top of an HDC represent the mean CRAM score and standard deviation of scores for 25 qualifying reference areas.

The age of a project is estimated as the elapsed time in years between the groundwork end date for the project and the date of the CRAM assessment. To add or update a groundwork end date, use the Project Events form in Project Tracker (ptrack.ecoatlas.org). The minimum age in years of a non-project area, including any natural reference area, is estimated from all available local information, including historical maps and imagery, historical written accounts, and place-specific scientific studies of habitat development.

An HDC can be used to address the following questions:

  1. At what time in the future will the area of assessed habitat achieve the reference condition or other milestones in habitat development? The HDC can answer this question if the CRAM score for the assessed area is within the confidence interval of the HDC. The answer is the time in years along the HDC between the current age of the assessed area and the future date corresponding to the intersection of the HDC and the reference condition or other milestone.
  2. Is the area of assessed habitat likely to develop faster, slower, or at the same pace as most other areas of the same habitat type? The habitat area is likely to develop faster, slower, or at the same pace if the CRAM score for the area is above, below, or within the confidence interval of the HDC, respectively.
  3. What can be done to improve the condition of the habitat area or to increase its rate of development? HDCs by themselves cannot answer this question. Possible answers can be inferred by the following analysis that involves HDCs:
    1. Examine the HDC for each of the four CRAM Attributes;
    2. Identify the Attribute(s) scoring below the HDC;
    3. For any low-scoring Attribute, examine the component Metric Scores (note: the Metric Scores for any public CRAM assessment in the CRAM database can be obtained through EcoAtlas);
    4. Assume the low score of an Attribute is due to its low-scoring Metric(s);
    5. Consider modifying the design or management of the habitat area in ways that will sustainably increase its score(s) for the low-scoring Metric(s).

For more information about CRAM Attributes and Metrics, including their scientific rationale, see the CRAM Manual.

Display Habitat Development Curves For Wetland Type:

CRAM Site Scores