Belden's Landing

Status Completed County Solano
Project Type Compensatory mitigation Location 38.18785° N, -121.97317° W Map
Project Area (Acres) 15.20 Last Updated 24 September 2024
Project Abstract Not provided
Administrative Region San Francisco Bay Regional Water Quality Control Board - Xavier Fernandez, SFBRWQCB

Project Identification

IDType
19-98 BCDC - Permit Number
240300 USACE - DA File Number

Habitat Plan

Site NamePhaseActivitySubActivitiesHabitatSubHabitatAcresActivity StatusWater Regime
Belden's Landing None Restoration/Re-establishment Estuarine Wetland Marsh 15.20 Construction completed Fully tidal

Related Habitat Impacts

Impact Project NameHabitatAcres LostType of Loss
Belden's Landing-impact Not Recorded

Sites

NameStatusAcres
Belden's Landing Construction completed 15.20
Belden's Landing - Project Boundary Unknown/Unspecified No Data

Events

DateTypeDescriptionSite Name
2006-06-01 Project entered Project entered into database
2002-01-01 Groundwork end On-the-ground work completed Belden's Landing
2002-01-01 Levee breach Levee Breach Date derived from SiteEvent Groundwork End Date and confirmed from first year monitoring report: Summer 2002. Levee breach was the removal of fill and construction of tidal channels. Belden's Landing
2000-08-10 Permit USACE permit issued
2000-08-10 Project start date Estimated date

People

TypeNameOrganizationDepartment
Contact Gil Conn Concept Marine Associates, Inc. Not applicable/Unknown
Contact Stephen Berger San Francisco Bay Regional Water Quality Control Board San Francisco Bay
Contact Michael Lango Solano County Regional Parks Not applicable/Unknown

Funding

PhaseActivityFunderAmount
No Data

Related CRAM Assessments

Visit DateVersionSite NameWetland TypeIndex Score
2007-10-02 5.0.0 Montezuma Bridge estuarine perennial non-saline 80
Name File Type Submitted On Submitted By
Belden's Landing Fishing Access Location Map, Project Plan, and Plan View Other 2008-03-22 Kelly Iknayan, San Francisco Estuary Institute
Department of the Army Permit No. 24030N Plan Or Permit 2008-03-22 Kelly Iknayan, San Francisco Estuary Institute
Project Description Other 2008-03-22 Kelly Iknayan, San Francisco Estuary Institute
Wetland Mitigation, Enhancement and Monitoring Report for Belden's Landing Water Access Facility Monitoring Report 2008-03-22 Kelly Iknayan, San Francisco Estuary Institute

How to Use the Habitat Development Curve

Habitat Development Curves (HDCs) are used to determine the developmental status and trajectory of on-the-ground projects to create, restore, or enhance California wetland and stream habitats. Each HDC is based on assessments of habitat condition for different age areas of one habitat type that in aggregate represent the full spectrum of habitat development. The assessments of condition are provided by expert applications of the California Rapid Assessment Method (CRAM). Visit the CRAM website for more information about CRAM.

For each HDC, reference condition is represented by areas of a habitat that consistently get very high CRAM scores, have not been subject to disruptive management practices, and exist within landscapes that are protected and managed for their natural conditions. The horizontal lines intersecting the top of an HDC represent the mean CRAM score and standard deviation of scores for 25 qualifying reference areas.

The age of a project is estimated as the elapsed time in years between the groundwork end date for the project and the date of the CRAM assessment. To add or update a groundwork end date, use the Project Events form in Project Tracker (ptrack.ecoatlas.org). The minimum age in years of a non-project area, including any natural reference area, is estimated from all available local information, including historical maps and imagery, historical written accounts, and place-specific scientific studies of habitat development.

An HDC can be used to address the following questions:

  1. At what time in the future will the area of assessed habitat achieve the reference condition or other milestones in habitat development? The HDC can answer this question if the CRAM score for the assessed area is within the confidence interval of the HDC. The answer is the time in years along the HDC between the current age of the assessed area and the future date corresponding to the intersection of the HDC and the reference condition or other milestone.
  2. Is the area of assessed habitat likely to develop faster, slower, or at the same pace as most other areas of the same habitat type? The habitat area is likely to develop faster, slower, or at the same pace if the CRAM score for the area is above, below, or within the confidence interval of the HDC, respectively.
  3. What can be done to improve the condition of the habitat area or to increase its rate of development? HDCs by themselves cannot answer this question. Possible answers can be inferred by the following analysis that involves HDCs:
    1. Examine the HDC for each of the four CRAM Attributes;
    2. Identify the Attribute(s) scoring below the HDC;
    3. For any low-scoring Attribute, examine the component Metric Scores (note: the Metric Scores for any public CRAM assessment in the CRAM database can be obtained through EcoAtlas);
    4. Assume the low score of an Attribute is due to its low-scoring Metric(s);
    5. Consider modifying the design or management of the habitat area in ways that will sustainably increase its score(s) for the low-scoring Metric(s).

For more information about CRAM Attributes and Metrics, including their scientific rationale, see the CRAM Manual.

Display Habitat Development Curves For Wetland Type:

CRAM Site Scores